Feb 11, 2026 ∙ 1 min
Toronto Downtown
WellFab recently completed the installation of a fully engineered chiller system for a new-build critical facility, delivering a complete cooling plant from the ground up. The scope included the installation of chillers, primary and secondary pumping systems, isolation and control valves, expansion equipment, and full mechanical piping assemblies designed to support efficient cooling distribution throughout the facility. This project demonstrates WellFab’s capability in delivering complete...
0
0
Sep 15, 2025 ∙ 1 min
WellFab recently completed a critical 8-inch line stop to replace an 8-inch valve at a casino in Niagara.
Without shutting down service. Using our specialized line stopping techniques, we ensured the operation was safe, precise, and efficient,...
5
0